Openreach ACCN : OR 053 | ![]() |
|||||||
Change | ||||||||
Effective Date | 07-Sep-07 | |||||||
Notification Date | 09-Aug-07 | |||||||
OPENREACH ACCESS CHARGE CHANGE NOTICE | ||||||||
ACCN NUMBER: | OR 053 | |||||||
PRODUCT: | LLU Comingling UBASE , 21CN Test Access Product and 21 CN Tie Cable Product | |||||||
EFFECTIVE DATE: | 07-Sep-07 | |||||||
SUBMITTED TO OFCOM ON: | 09-Aug-07 | |||||||
Price List | ![]() |
|||||||
Section : | Local Loop Unbundling | |||||||
Product : | Plan & Build | |||||||
Page : | Accomodation | |||||||
Reference : | 2.2.1 | |||||||
Co-mingling | ||||||||
Operative Date | Until | Charge | ||||||
£ Exc VAT | ||||||||
Initial UBASE rack including 5400 pair capacity Handover Distribution Frame or Cable Management Frame | 07/09/2007 | 8500.00 | ||||||
Initial or Additional UBASE standard rack (no Handover Distribution Frame or Cable Management Frame included) | 07/09/2007 | 7400.00 | ||||||
Provision of first Rack Space Unit (RSU) provided at time of initial order or when ordered at a subsequent date | 07/09/2007 | 322.00 | ||||||
Provision of each additional RSU | 07/09/2007 | 64.00 | ||||||
Price List | ![]() |
|||||||
Section : | Local Loop Unbundling | |||||||
Product : | Plan & Build | |||||||
Page : | Power | |||||||
Reference : | 2.2.2 | |||||||
DC Power Options | ||||||||
Operative Date | Until | Charge | ||||||
£ Exc VAT | ||||||||
Additional rectifier provided at initial build to provide n+1 capacity for LCU, MCU1 or MCU2 products or per 1.5kw capacity incremental step for the UBASE product -Note 2 | 01/10/2004 | 74.00 | ||||||
Price List | ![]() |
|||||||
Section : | Local Loop Unbundling | |||||||
Product : | Plan & Build | |||||||
Page : | Tie Cables | |||||||
Reference : | 2.2.3 | |||||||
Tie Cables | ||||||||
FOR PRICES IN THIS SECTION PLEASE REFER TO NOTE 41 FOR CONNECTIONS AND NOTE 44 FOR RENTALS | ||||||||
NETWORK SERVICES | ||||||||
Schedule 01 – Internal Tie Cable (Note 2) | ||||||||
Operative Date | Until | Charge | ||||||
£ Exc VAT | ||||||||
Handover Distribution Frame charge per 100 pair tie cable (Note 17) | 01/10/2004 | 22.59 | ||||||
Handover Distribution Frame Extension to provide additional 1500 tie pair capacity for MCU1 (Note 18) | 01/10/2004 | 192.74 | ||||||
Additional Handover Distribution Frame to provide additional 4800 tie pair capacity for B-BUSS7 (Note 19) | 01/10/2004 | 1457.37 | ||||||
Standalone Handover Distribution Frame (HDF) 9 | 02/05/2007 | 1999.09 | ||||||
Standalone Handover Distribution Frame (HDF) 18 | 02/05/2007 | 2093.14 | ||||||
Internal Tie Cable (2) Jointing Fixed Charge per External Tie Cable (Note 9) | 01/01/2005 | 143.92 | ||||||
MDF Licence Fee per Internal Tie Cable per annum (Notes 2 and 12) | 01/01/2005 | 23.64 | ||||||
(See early cancellation fee below) | Operative Date | Until | Connection Charge | Annual Rental (Note 2) |
||||
£ Exc VAT | £ Exc VAT | |||||||
Internal Tie Cable (1) for Co-Location and Co-Mingling | 01/01/2005 | 476.89 | 19.48 | |||||
Internal Tie Cable (2) (Notes 9) | 01/01/2005 | 376.83 | 14.08 | |||||
Enhanced Specification LLU Internal Tie Cable (1) for Co-location and Co-mingling | 15/05/2006 | 848.00 | 71.86 | |||||
21CN-32 pair standard Internal Tie Cable-HDF connected | 07/09/2007 | 322.00 | 34.00 | |||||
21CN-64 pair standard Internal Tie Cable-HDF connected | 07/09/2007 | 409.00 | 43.00 | |||||
21CN-32 pair standard Internal Tie Cable-Bare Ended Coil | 07/09/2007 | 311.00 | 33.00 | |||||
21CN-64 pair standard Internal Tie Cable-Bare Ended Coil | 07/09/2007 | 397.00 | 42.00 | |||||
21CN-100 pair standard Internal Tie Cable-Bare Ended Coil | 07/09/2007 | 673.00 | 68.00 | |||||
21CN-32 pair enhanced Internal Tie Cable-HDF connected | 07/09/2007 | 337.00 | 36.00 | |||||
21CN-64 pair enhanced Internal Tie Cable-HDF connected | 07/09/2007 | 430.00 | 46.00 | |||||
21CN-100 pair enhanced Internal Tie Cable-HDF connected | 07/09/2007 | 744.00 | 75.00 | |||||
21CN-32 pair enhanced Internal Tie Cable-Bare Ended Coil | 07/09/2007 | 323.00 | 34.00 | |||||
21CN-64 pair enhanced Internal Tie Cable-Bare Ended Coil | 07/09/2007 | 414.00 | 44.00 | |||||
21CN-100 pair enhanced Internal Tie Cable-Bare Ended Coil | 07/09/2007 | 710.00 | 72.00 | |||||
EvoTam connection for 32 pair (SMPF only) (Note 20) | 07/09/2007 | 166.55 | ||||||
EvoTam connection for 64 pair (SMPF only) (Note 20) | 07/09/2007 | 333.11 | ||||||
EvoTam connection for 100 pair (SMPF only) (Note 20) | 07/09/2007 | 520.48 | ||||||
Test Head Connection including site visit | 07/09/2007 | 672.74 | ||||||
Test head Connection excluding site visit | 07/09/2007 | 321.49 | ||||||
Test Port Rental | 07/09/2007 | 27.36 | ||||||
No price has yet been set for the Test Session Request associated with Test Access on the EVOTAM, however, it is anticipated that an indicative price of between £0.30 and £0.72 per Test Session will be applied. | ||||||||
Enhanced Specification LLU Internal Tie Cable (1) – early cancellation fee - Operative until 06/09/2007 | ||||||||
An early cancellation fee applies to the Enhanced Specification LLU Internal Tie Cable (1). The table below explains the relevant fee payable to Openreach for the year in which the Enhanced Specification LLU Internal Tie Cable (1) is cancelled. | ||||||||
Year | 1st | 2nd | 3rd | 4th | 5th | 6th | 7th | |
Fee (£) | 558.94 | 519.02 | 479.1 | 439.17 | 399.25 | 359.32 | 319.4 | |
Year | 8th | 9th | 10th | 11th | 12th | 13th | 14th | |
Fee (£) | 279.47 | 239.55 | 199.62 | 159.7 | 119.77 | 79.85 | 39.92 | |
LLU Internal Tie Cable – early cancellation fee - Operative from 07/09/2007 | ||||||||
An early cancellation fee applies to all LLU Internal Tie Cables. The table below explains the relevant fee payable to Openreach for the year in which the LLU Internal Tie Cable is cancelled. | ||||||||
Year | 1st | 2nd | 3rd | 4th | 5th | 6th | 7th | |
Fee (£) | 7 x annual rental |
6.5 x annual rental |
6 x annual rental |
5.5 x annual rental |
5 x annual rental |
4.5 x annual rental |
4 x annual rental |
|
Year | 8th | 9th | 10th | 11th | 12th | 13th | 14th | |
Fee (£) | 3.5 x annual rental |
3 x annual rental |
2.5 x annual rental |
2 x annual rental |
1.5 x annual rental |
1 x annual rental |
0.5 x annual rental |
|
NOTES: | ||||||||
20) The EvoTAM Connection charge will only be payable by SMPF CPs who opt to buy the Test Access Product or require the LLUT tie cable to intercept the EvoTAM for ease of future migration to MPF. | ||||||||
British Telecommunications plc | ||||||||
Registered office: | ||||||||
81 Newgate Street | ||||||||
London EC1A 7AJ | ||||||||
Registered in England and Wales No. 1800000 | ||||||||
Date: 09 August 2007 | www.openreach.co.uk |